Skip to main content
SERVING ALL OF BRITISH COLUMBIA

Traffic stops where we stand.

Quickstop Traffic Control deploys certified crews, signage, and traffic management plans across BC — fast, safe, and to spec.

Dispatch coverage
24/7Dispatch coverage
Avg. response in metro BC
<2 hrAvg. response in metro BC
BC TCP certified crew
100%BC TCP certified crew
Liability insured
$5MLiability insured

Service areas

Serving Lower Mainland, Victoria, Vernon, Kelowna, Prince George — all of British Columbia.

WHAT WE DO

Full-service traffic control, end to end.

All services

WHY QUICKSTOP

Built for BC roads.

From the Sea-to-Sky to the Okanagan, our crews know the routes, the weather, and the regulations. We show up early, set up right, and don’t leave until the job is done.

WorkSafeBC compliant
Every site documented and audit-ready.
24/7 emergency response
Dispatch standing by, day and night.
Province-wide coverage
Crews across Lower Mainland, Interior & Island.

How it works

How a job runs.

  1. 01

    Scope

    You send the site, the work, and the dates. We identify the road authority and what the layout has to account for.

    What we need from you

    • Site address and the limits of the work
    • What the work is, and how long it runs
    • Dates, hours, and whether nights are an option
    • Lane, sidewalk, and driveway impact
  2. 02

    Plan & permit

    We prepare the traffic management plan to MoTI, TAC, and municipal requirements, then submit it on your behalf.

    What goes into the plan

    • Work zone layout and device placement
    • Flagger positions and communication protocol
    • Certification levels of the crew on site
    • Detour routing where required
    • Contingencies for weather and emergency access
  3. 03

    Crew dispatched

    BC TCP certified flaggers arrive with the signage, devices, and paperwork the approved plan calls for.

    What arrives on site

    • BC TCP certified flaggers, in full PPE
    • Signage, cones, delineators, and barricades per the plan
    • Arrow boards or message signs where called for
    • The approved plan itself, on site and in hand
  4. 04

    Monitored throughout

    Devices go in to spec and the site is watched for the duration — not set and left. Conditions change; the setup keeps up.

    What we watch

    • Device positions against the approved layout
    • Queue length and how traffic is actually behaving
    • Sight lines as light and weather change
    • Emergency vehicle access, kept open at all times
  5. 05

    Takedown & record

    We remove the setup, restore normal flow, and leave you the documentation that makes the site audit-ready.

    What you're left with

    • Every device removed, normal flow restored
    • A documented record of how the site was set up
    • Paperwork that stands up to a WorkSafeBC audit
    • A crew you can call again tomorrow

Need a crew tomorrow morning?

Tell us the site, the scope, and the timeline. We’ll send a quote within the hour — and a crew when you need one.